Federal regulations require Metropolitan Planning Organizations to consider not only existing conditions when completing transportation plans, but to also consider probable future conditions. The APO maintains a Travel Demand Model (TDM) to provide reasonable estimates of future traffic conditions at the regional level. Our TDM is in CUBE from Bentley Systems. In order to use the model to predict future traffic flows, we must first calibrate the model to known traffic conditions. In this case, our base year is 2025 and our forecast year is 2055.
The APO needs an experienced, qualified firm to complete our model calibration to base year 2025 traffic volumes.
But first, interested firms must understand that the APO’s TDM has recently undergone some major updates. APO staff completed a comprehensive review of all Traffic Analysis Zone (TAZ) boundaries and centroid placements/connections to better reflect urban area growth and the natural barriers that generally restrict traffic flow from one area to another. In addition, in order to make the model sensitive to changes that can impact greenhouse gas emissions, we have had other changes incorporated into the TDM, including but not limited to:
- Specifying intersection control at all nodes
- Changing mode-choice procedures
- More dynamic traffic assignment that is sensitive to travel times when making routing choices
- Updated highway capacities
- Updated land-use area types.
Given all these comprehensive and detailed changes, the first step for the successful firm will be to verify that all of these updates are functioning as intended and are not having unintended consequences on the model output, such as through broken links, incorrect or incomplete traffic assignment, etc.
Following successful calibration of the TDM to base year 2025, the consultant shall produce a report detailing how well the TDM is performing relative to actual measured transportation data. The consultant shall calibrate and validate the TDM using a methodology consistent with applicable Minnesota Department of Transportation (MnDOT) requirements and Federal Highway Administration (FHWA) guidance. The consultant shall identify proposed performance measures and acceptance criteria for APO review and approval before beginning calibration. Concurrent with model calibration, the consultant shall use reasonable and defensible methods to forecast to year 2055 the socio-economic variables necessary for the TDM to function, such as the number of households and household size, the number of office jobs, the number of students enrolled at each school, etc. Within their proposal, each consultant should detail the methods they would use to develop these forecasted socio-economic variables. Consultants should budget for at least one presentation of draft socio-economic variables at a meeting of the APO’s Technical Advisory Committee (TAC). The consultant will be expected to work with the TAC as a whole and with individual members of the TAC to gain approval for their forecast of socio-economic variables. The consultant shall also distribute the socio-economic variables down to the TAZ level for every TAZ in the APO’s TDM.
Following assignment of the 2055 socio-economic variables to the TAZs, the consultant shall be responsible for carrying out a “No Build 2055” model run. That is, the consultant shall use the 2025 + committed transportation network and the 2055 forecasted TAZ data to produce a model run which highlights the areas of the transportation network where congestion and/or poor operations are probable if the jurisdictions of the APO made no further investment in the transportation network.
Deadline for Proposal Submission: December 31, 2026
Project Budget: $116,000
Questions & Answers
This is where questions about the RFP will be answered. The deadline for submission of questions by email is December 11, 2026. The deadline for APO responses to those questions is December 15, 2026.